M.047 · OFFSHORE WIND
North Sea W-12 — full-array blade survey
76 turbines, 228 blades, 11 days. Three urgent findings; one rope team retrained as operators.
- Units
- 2 × A-7
- Season saved
- − 74 days
M.039 · RAIL & BRIDGES
Fjord crossing — cable & deck inspection
A-7 spirals on the pylons, C-2 inside the box girder. Zero lane closures on a crossing that hates closing.
- Units
- A-7 + C-2
- Closures
- 0
M.041 · PORTS & HULLS
Rotterdam — hull & berth survey programme
M-1 class surveys between tides, C-2 above the waterline. Divers now dive only when something must be touched.
- Units
- M-1 + C-2
- Dive hours
- − 82%
M.035 · POWER GRID
Jutland grid — 400 kV corridor, BVLOS
Six hundred pylons a week under corridor authorisation, change-detected against last season’s baseline.
- Units
- 3 × A-7 BVLOS
- Pylons / week
- 600
M.033 · INDUSTRIAL TANKS
Hamburg tank farm — in-service wall thickness
C-2 ultrasonic grids on twelve live tanks. No emptying, no scaffolding, no permit-to-work marathon.
- Units
- 2 × C-2 (ATEX)
- Scaffolding
- € 0
M.OPS · OPERATOR PROGRAMME
Operator training — your crews, our systems
Fourteen client teams certified to fly and drive their own units. The rope kit stays in the van, ceremonially.
- Teams certified
- 14
- Course
- 5 days + checkride