Ground The Diary
The diary: watch it rise.
Every month since groundbreak: photos, drone footage, and numbers we can be held to. Buyers get an alert the day their floor is poured — most frame the photo.

Floor 58 topped out
The pour, the drone run, and why the crane driver got a standing ovation from the sales suite.
Photos · drone · numbers
Glass to 34
The facade line crossed the Terraces. First sunset reflections photographed from the river path — the render was conservative.
Photos · facade report
The wind weeks
Two weeks lost to sustained river wind above floor 50. What it means for the schedule (nothing, yet) and how the buffer works.
The honest one
Water in the pool
Floor 09 commissioning began. The first swim belongs to the site team — that's in their contract, and they earned it.
Amenities milestone
41C gets dressed
The show residence fit-out, from bare slab to herringbone. Six weeks, photographed daily.
Show residence
The panel test
One facade panel, one wind tunnel, 140 km/h. The footage the engineers watch with popcorn.
Engineering